| Vorlesung | Erdbeben I/II
| Entwurf und Ertüch- tigung | Primary Hazard and Risks
| GIS | EQ Engineering and Structural Design | Hazard Projects and Advanced Geotech- nologies | Exp. Structural Evaluation and Reha- bilitation | Risk Projects and Evaluation of Structures | Sonstige | | Projekt | | NHRE 1st Semester | NHRE 2nd Semester | NHRE 3rd Semester | NHRE 4th Semester / MVS | Rot (Toyota/ Haselnussfabrik) | | o | | | o | | | o | o *2 | Karminrot (reinterpretation, strenghtening) | | o | | | | | ( ) | | o *2 | Grün (RC frame, regularity consideration) | o | | | | o | | | | | Hellgrün I (GIS: Sachsen/ Thü.) | x | | | o | | o | | | | Hellgrün II (RC frame, capacity design, pushover) | x | | | | | | | | | Dunkelgrün (RC frame, regularity considerations, capacity design, pushover) | | x | | | | | | | | Blau (Ersatzsystem aus Stahl) | | | | | | | | | o *2 | Orange (RC frame structure with/ without masonry infills) | | | | | x | | x | x | | Violett (Erdbebengerechtes Bauen mit lokal verfügbaren Meterialien ...) | | | | | | | | ( ) | o *1 | Gelb (Structures in EQ region) | | | | | x | | | | | Rainbow I
(GIS) | | | | x | | | | | | Rainbow II (Evaluation of RC Frame Systems Designed for Earthquake Regions) | | | | | | | | x | o *2 | Karo (small scale testing) | | | | | | | x | | | Azur I
(Regional Ground Motion Prediction and Database) | | | x | | | | | | | Azur II (Earthquake Catalogues and seismicity models) | | | | | | x | | | |
x Pflicht o alternativ ( ) zusätzlich nach Vereinbarung (auf Anfrage)
*1 - Special Project
*2 - Summer Course "MVS"
|